CREATECH Software · Automation · Artificial Intelligence
Corporate introduction · September 2026

BLE RTLS
& AoA

Precise indoor positioning from the angle of arrival — with delivery management, telemetry and vision analysis on the same infrastructure.

This document presents the Createch BLE Location Platform in three layers: AoA-based precise positioning inside the plant, then logistics and delivery management beyond the loading dock, and on top of both, telemetry with AI-powered vision analysis.

PART A Plant & AoA PART B Logistics & Delivery PART C Safety & AI
createch.com.tr/en/ info@createch.com.tr/ +90 850 441 27 32
CEILING · MOUNTING HEIGHT θ1 θ2 AoA LOCATOR 01 AoA LOCATOR 02 BLE CARD · CTE BROADCAST θ₁ ∩ θ₂ ESTIMATED X-Y POSITION
CREATECH · BLE RTLS & AoAContents and document map
Document map

The chain starts in the plant, changes hands at the dock, and continues on the vehicle and the platform

This document follows that chain. The emphasis is on AoA-based precise positioning inside the plant; the delivery, telemetry and vision analysis layers are then added on the same data model.

01 · INSIDE THE PLANT BLE RTLS · AoA precise position Forklift safety · muster drill Pallets, equipment, stock count PAGES 03 — 14 02 · LOADING AND DOCUMENTS RF-ID / barcode verification Delivery on the tablet Delivery note and invoice flow PAGES 15 — 17 03 · ON THE VEHICLE Telemetry · on-board unit Cloud camera · blind spot radar Route and dispatch optimization PAGES 18 — 19 04 · SAFETY AND AI CCTV + AI · card-less person Driver behaviour analysis Geofence · compliance PAGES 20 — 23 ONE IDENTITY AND LOCATION DATA MODEL — CREALOG PLATFORM · CREAAI
PART A · PLANT AND PRECISE POSITION
03Key challenges and the location layer
04BLE RTLS: the shared location layer
05How AoA works: phase and angle
06Accuracy classes and comparison
07Multi-locator estimation, geometry
08Hybrid architecture: method by area
09Site design and engineering criteria
10In-plant use cases
11Forklift safety and dynamic risk
12Product screens: live position, setup
13Product screens: drill, track replay
14Field validation and examples
PART B · LOGISTICS, DELIVERY AND TELEMETRY
15Handover point: dock, one identity
16Delivery management on the tablet
17Delivery note, invoice and ERP
18Telemetry and on-vehicle hardware
19Route and dispatch optimization
PART C · SAFETY AND ARTIFICIAL INTELLIGENCE
20CCTV + AI: card-less person event
21Driver and in-cab vision analysis
22Cloud camera, radar, event recording
23Geofence and camera management
CLOSING
24One platform: Crealog and CreaAI
25Roadmap and acceptance criteria
26Contact and next step
About the figures in this document

Accuracy ranges are typical values for each technology class; performance indicators are target values. An accuracy commitment follows a site survey, RF analysis and pilot installation.

IN ONE SENTENCE

Not a tracking system, but a shared location and identity layer that new assets and modules can be added to.

Createch R&D · Industrial Positioning and AI Integration
CREATECH · BLE RTLS & AoAPart A · Plant and precise position
Part A · Starting point

What a plant is missing
is not data, but
location itself

Production, maintenance and safety processes all rest on the same question: who or what is where, right now? When that question cannot be answered, reports rely on what people say, incident reviews rely on memory, and safety relies on discipline alone.

BLE RTLS closes that gap. The investment goes not into a single application but into a location and identity layer that further scenarios can be built on.

Why does precision matter?

“Which zone?” is answered economically with RSSI. But in areas such as forklift routes, production lines and loading bays, the decision turns on sub-metre differences. Angle of arrival (AoA) measurement is exactly what those areas call for.

Key challenges
01 · VISIBILITY

Scattered, untraceable processes

When data from different equipment and vehicles cannot be gathered in one place, operational visibility is limited and every department works from its own spreadsheet.

02 · SAFETY

Proximity risk cannot be measured

Dangerous approaches between forklifts and people are discussed only after an accident; beforehand, no measurable indicator is produced at all.

03 · EVENT RECORD

Incidents are missed

Not being able to reach camera footage and position history in time at critical moments makes incidents hard to analyse and harder to prevent.

04 · COMPLIANCE

Site safety versus legal duty

Obligations such as a recording ban in restricted areas cannot be reconciled with the need for site safety by manual means.

05 · PRODUCTION

No visibility into machines

Being unable to pull data from robot and machine controllers makes bottlenecks in the production process impossible to identify.

06 · CONTINUITY

Monitoring stops at the gate

Data gathered inside the facility ends the moment goods or people leave the door; plant and field end up managed as two separate worlds.

WHAT THIS PART ANSWERS

A hybrid BLE architecture inside the plant: zone detection with RSSI across wide areas, and precise X-Y positioning with AoA in critical areas. The same card and the same platform then continue, without a break, into the logistics and safety layers.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 01 · BLE platform
01 · BLE platform

BLE RTLS: the plant's shared location layer

Broadcasts from BLE cards and tags are picked up by the Gateway and Locator devices in the field and turned into position data by the central RTLS engine. One infrastructure makes staff, forklifts, pallets and equipment visible on the same network.

01 · FIELD 02 · SENSING 03 · PROCESSING 04 · OUTPUT Staff card BLE TAG · BATTERY Forklifts, vehicles POSITION · SPEED · HEADING Pallets, equipment ASSET INVENTORY Gateway RSSI · zone detection AoA Locator Antenna array · angle Mobile Gateway Shuttle vehicle · 4G / 5G RTLS Engine Measurement fusion · RSSI + AoA Filtering and track building Zone and floor-level matching Rule engine and event generation Live map and floor plan ZONE HEADCOUNTS Alarm and event stream PROXIMITY · ZONE BREACH Track replay and reporting RETROSPECTIVE REVIEW API and ERP integration CREALOG · CREAAI
Diagram · The location chain  The same chain carries both RSSI and AoA measurements; which method is used in which area is decided during project design.
LOW POWER

Battery life is part of the design

Suited to battery-powered cards and tags. The broadcast interval and battery life are optimized together, and the position update rate is set to match the scenario.

FLEXIBLE COVERAGE

As much technology as each area needs

Zone detection and precise positioning can be used side by side in the same project. Coverage geometry is designed area by area rather than imposing one accuracy class on the whole site.

ONE IDENTITY

The identity layer stays whole

The same BLE card can be used in the plant, on the shuttle vehicle and in other processes, so a person's journey to the site and their movement inside it share one digital identity.

WHAT CAN BE ADDED TO THE SAME NETWORK LATER

New tag types and software modules join the same platform later.

AoA precision areaNew tag type Forklift safetyPallets, equipment Stock countingMuster drill GeofenceLone worker In-vehicle gatewayCCTV + AI
ARCHITECTURAL PRINCIPLE

The method suits the area; the data model stays the same everywhere. A zone's accuracy class can be raised later without touching the software.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 02 · ANGLE OF ARRIVAL
02 · AoA · Angle of arrival

Angle of Arrival: the layer that measures the angle and computes the position

BLE TAG · CTE BROADCAST WAVEFRONTS ARRAY NORMAL θ PATH DIFFERENCE Δ = d · sin θ AoA LOCATOR Antenna switching · I/Q sampling 1234 d ELEMENT SPACING MEASURED PHASE DIFF. Δφ · PER ANTENNA PAIR ANGLE CALCULATION Δφ = (2π · d / λ) · sin θ θ = arcsin( λ · Δφ / 2π · d ) 2.4 GHz BAND · λ ≈ 12.5 CM · ELEMENT SPACING d = λ/2 ≈ 6.2 CM · MULTIPATH AND ARRAY GEOMETRY AFFECT THE RESULT
Diagram · Phase difference geometry  The same wavefront reaches the antennas at slightly different times. The resulting path difference is measured as a phase difference, and the angle of arrival is calculated from it. Choosing half a wavelength as the element spacing avoids angular ambiguity.

The antenna array on an AoA Locator analyses the phase differences a BLE Direction Finding signal produces across its antennas. Using raw I/Q samples, the antenna geometry and positioning algorithms, it calculates azimuth — and with suitable hardware and installation, elevation as well.

01

BLE CTE

The tag broadcasts a Constant Tone Extension.

02

Antenna array

Antennas are switched in turn; phase differences appear.

03

I/Q samples

Samples are processed with the array geometry.

04

Angle calculation

Azimuth — and elevation where supported — is produced.

CTE TIMELINE · ANTENNA SWITCHING GUARD 4 µs REFERENCE 8 µs SWITCH AND SAMPLE SLOTS · 1 – 2 µs SWITCH SAMPLE …
A guard period, a reference period on a single antenna, then the switch and sample slots. The reference period sets the carrier phase for the measurement.
Why alongside RSSI?

RSSI answers “which section or zone?” economically. AoA enables precise X-Y positioning in critical areas. Rather than fitting out the whole plant with AoA, a hybrid architecture is built.

ENGINEERING NOTE

A linear array yields azimuth only; elevation needs a planar array. Spacing wider than half a wavelength introduces angular ambiguity (grating lobes).

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 03 · Accuracy classes
03 · Accuracy classes

Which question does each measurement answer?

Position accuracy is not a product feature but a design decision. Because several methods can be combined on the same BLE infrastructure, accuracy is chosen according to the business value of each area.

TYPICAL ACCURACY RANGES · BY TECHNOLOGY CLASS 10 CM30 CM 1 M3 M10 M POSITION ERROR · LOGARITHMIC SCALE UWB RTLS · 10 – 30 CM BLE AoA · 0.5 – 1 M · PRECISE POSITION CHANNEL SOUNDING · NEXT-GEN RANGING BLE RSSI · 2 – 5 M BLE PRESENCE · ROOM / ZONE
These are typical ranges for each technology class; the real accuracy of an installation depends on the RF environment, Locator geometry, mounting and calibration.
TechnologyMeasures Typical accuracyTypical use
BLE PresenceCoverageRoom / zone “Is this person in this zone?” · lowest-cost setup
BLE RSSISignal strength2 – 5 m Zone / section detection · wide-area coverage
BLE AoAAngle of arrival0.5 – 1 m Precise X-Y positioning · critical areas
Channel SoundingDistanceClass: sub-metre Next-generation precise ranging · on the roadmap
UWBTime / distance10 – 30 cm Point applications needing very high precision
Comparison of indoor positioning technologies: BLE Presence, BLE RSSI, BLE AoA and UWB RTLS, each shown on the same room plan with its typical accuracy, use case and key benefits.
Diagram · Positioning technologies compared  Four methods on the same room plan: zone detection by coverage area, trilateration from signal strength, intersecting angles of arrival, and ultra-wideband time-of-flight measurement.
Return on investment

There is no need to fit the whole site with the most precise technology. When the accuracy class is chosen zone by zone, the same budget buys wider coverage and more scenarios — while no compromise is made where precision creates business value.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 04 · Estimation and geometry
04 · Estimation and geometry

An angle alone is not a position: intersection and geometry

A single Locator gives only a bearing. Position is estimated by intersecting the angles measured by several Locators. That is why real accuracy is determined not by the hardware alone but by how the Locators are laid out across the site.

GOOD GEOMETRY · BEARINGS CROSS AT WIDE ANGLES POSITION TIGHT UNCERTAINTY L1 L2 L3 WIDE BASELINE · SEEN FROM THREE DIRECTIONS POOR GEOMETRY · BEARINGS ALMOST COINCIDE UNCERTAINTY STRETCHES ALONG RANGE L1 L2 L3 SHORT BASELINE · MOUNTED IN LINE AND CLOSE TOGETHER
Diagram · The effect of Locator geometry  Each cone represents the uncertainty in one Locator's angle measurement. Where the cones cross at wide angles, uncertainty stays tight in both axes; where Locators are in line, it stretches along the range direction. Not a scaled calculation.
01 · LINES OF SIGHT

How many Locators see it?

In precision areas the tag should be seen by several Locators. A single line of sight yields only a bearing.

02 · BASELINE

The distance between them

As the distance shrinks, bearings converge and the intersection weakens. Layout is planned for baseline length as well as coverage.

03 · ORIENTATION

Antenna direction and height

Antenna orientation and mounting height directly affect coverage. Where floor levels differ, elevation is assessed separately.

04 · CONSEQUENCE

Accuracy is born on site

The same hardware gives different results in different layouts, so precision is measured in a pilot area and turned into an acceptance criterion.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 05 · Hybrid architecture
05 · Hybrid architecture

The right measurement in the right area: one network, three accuracy classes

The site is divided into zones according to the accuracy each one needs. Zone detection is enough in offices and the general warehouse; AoA comes into play along forklift routes, production lines and loading bays; shuttle vehicles carry coverage beyond the site. All of it runs on the same platform and the same card.

BUILDING ENVELOPE · GROUND FLOOR OFFICESCANTEEN AND WELFARE GENERAL WAREHOUSE RSSI · ZONE DETECTIONRSSI · ZONE DETECTION RSSI · ZONE DETECTION PRODUCTION LINEFORKLIFT ROUTE LOADING BAY AoA · PRECISE X-Y POSITIONAoA · PRECISE X-Y POSITION AoA · PRECISE X-Y POSITION LOADING DOCK YARD AND DISPATCH IN-VEHICLE GATEWAY · 4G / 5G Shuttle and delivery vehicles THE SAME STAFF CARD IS READ Coverage extends beyond the site; monitoring never stops. GATEWAY · RSSI AoA LOCATOR TAGGED ASSET FORKLIFT
Diagram · Hybrid layout  The layout and zone names are illustrative; in a real installation the zone boundaries, Locator count and mounting heights are engineered from a site survey.
STANDARD AREAS

Zone detection is enough

Offices, canteen and general warehouse: “which zone?” is answered economically with RSSI, covering a wide area with few devices.

CRITICAL AREAS

Precise position with AoA

Forklift routes, production lines and loading bays: because the decision turns on sub-metre differences, angle-of-arrival measurement comes into play.

MOBILE AREAS

Coverage extends beyond the site

The BLE gateway in shuttle and delivery vehicles reads the same card; data flows to the platform over 4G/5G and the identity layer stays whole.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 06 · Field engineering
06 · Field engineering

Accuracy depends on the site, not the datasheet

MULTIPATH · DIRECT AND REFLECTED PATH AoA LOCATOR METAL RACK REFLECTIVE SURFACE BLE TAG DIRECT PATH REFLECTED PATH APPARENT ANGLE SHIFTS
A reflection can shift the angle the array sees away from the true bearing. This is why, in precision areas, the aim is for the tag to be seen by several Locators from different directions.
How is an accuracy commitment given?

A theoretical accuracy figure is never written into a contract. Precision is defined after a site survey, RF analysis and pilot installation, as a measurable acceptance criterion based on points measured in the plant's real conditions.

01 · MULTIPATH

RF reflections

Reflections from metal racking, machine bodies and flat surfaces affect the measurement. Layout is planned with the position of reflective surfaces in mind.

02 · GEOMETRY

Locator layout

In precision areas the aim is for the tag to be seen by several Locators from suitable angles; baseline length and lines of sight are designed together.

03 · MOUNTING

Antenna direction and height

Antenna orientation and mounting height directly affect coverage geometry. The same device at the wrong height covers a narrower area than expected.

04 · CALIBRATION

Pilot-area measurement

Site calibration is carried out using reference measurement points across a pilot area, and the acceptance test is run against those same points.

05 · BROADCAST INTERVAL

Update rate and battery

Position update rate and battery life are optimized together: fast broadcast for safety scenarios, long battery life for inventory.

06 · HYBRID INSTALL

Where does AoA go?

AoA is used only in areas where the precision creates business value; the remaining areas are covered economically by zone detection.

PROJECT FLOW · THE COMMITMENT IS FORMED ON SITE
01

Site survey

Layout, floor levels, reflective surfaces and zone requirements are documented.

02

RF analysis

Coverage and interference analysis; device count and positions are determined.

03

Pilot install

Real measurement, site calibration and validation in a limited area.

04

Acceptance criterion

Measured values become the acceptance test and the contractual commitment.

05

Roll-out

The validated design is scaled across the whole site.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 07 · In-plant use cases
07 · In-plant use cases

Eight scenarios running on one shared infrastructure

Once the location layer is in place, each additional scenario means a new rule set and a new screen rather than a new hardware investment.

01 · STAFF

Zone and position visibility

In-plant zone and position, entry/exit flow and time on task. Zone density and transition records are reported per shift.

02 · FORKLIFTS

Position, route and utilization

Vehicle position, the route taken, zone density and idle time. Utilization analysis becomes an input to fleet-size decisions.

03 · SAFETY

Dangerous proximity

Distance, direction of travel and speed between people and vehicles are weighed together to run risk rules. See the next page for detail.

04 · PALLETS AND EQUIPMENT

Last seen position

Where and when an asset was last seen is on record. “Where is this equipment?” is answered by a query rather than a search.

05 · STOCK COUNTING

Automatic zone-based control

Automatic zone-based control of BLE-tagged assets shortens counting time and exposes the gap between physical stock and the record.

06 · MUSTER DRILL

Assembled and still inside

When an emergency or drill starts, the number of people who have reached the assembly point and those still inside is tracked with elapsed time.

07 · GEOFENCE

Unauthorized zone entry

Unauthorized entry into areas such as a transformer room, chemical store or maintenance bay raises an immediate alarm and creates an event record.

08 · LONE WORKER

Working alone detection

A person left alone in a hazardous zone, a lack of movement, or an unusually long stay in one zone are all monitored by the rule engine.

The scenarios feed one another

The same track data produces the safety alarm, the forklift utilization report and the post-incident review. That is why infrastructure built for one scenario needs no further hardware investment when the others are commissioned.

INPUTS TO THE RULE ENGINE
Position (X-Y)ZoneFloor level SpeedHeadingDwell time Identity and rightsBattery state ShiftCamera zone
Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 08 · Forklift safety
08 · Forklift safety

Not proximity, but the approach vector

The system weighs more than the distance between forklift and pedestrian: it takes the forklift's direction of travel and speed, the person's position and the approach vector together. The same distance therefore produces different risk in different directions.

CRITICAL ZONE HIGH-PRIORITY ALARM RISK ZONE DRIVER / PEDESTRIAN WARNING CAUTION ZONE TRACK AND LOG THE EVENT FORKLIFT · FL-03 v PEDESTRIAN · PR-13 approach DYNAMIC RISK CALCULATION Δs · instantaneous distance Δv · closing speed θ · angle of approach TTC ≈ Δs / Δv ESTIMATED TIME TO CONTACT
Diagram · Directional risk zones  The zones extend along the forklift's direction of travel, so the same distance behind the vehicle produces lower risk. The radii and angles shown were chosen to illustrate the principle; project parameters are set on site.
CAUTION ZONE

Tracked and logged

The approach is tracked and an event record can be created, gathering data before any intervention is needed. Reporting is built on these records.

RISK ZONE

A warning is raised

Warnings can be raised for both driver and pedestrian. The system steps in once the approach threshold is crossed and the event is flagged as priority.

CRITICAL ZONE

Alarm and integration

A high-priority alarm and integration scenario, designed to work alongside the existing safety systems on site.

DECISION CHAIN
01

Position

Forklift and pedestrian positions are read at the same time.

02

Speed + heading

The movement vector is derived from position history.

03

Approach

The approach vector and estimated time to contact are computed.

04

Risk / alarm

A record, a warning or an alarm is raised by risk level.

Engineering note · safety-critical applications

In safety-critical applications, central RTLS does not replace the local sensors and warning systems on the vehicle; it is a complementary layer. Alarm thresholds are set together with the site's own safety procedures.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 09 · Product screens
09 · Product screens

Live position and site setup

The user-facing side of the location layer comes down to two screens: BLE Monitor, which watches the site live, and BLE Setup, which manages the site, zone, Locator and rule inventory.

BLE Monitor live position screen: real-time tag positions on the site plan, Locator coverage areas, zone headcounts and the list of open alarms.
01 · Live position  Every tag's current position and the Locator coverage areas on the site plan. The left panel holds open alarms and zone headcounts; the right panel lists the tags with their last-seen information. Screen labels are in Turkish.
ALARM PANEL

Vehicle approach, zone breach, excessive dwell and low battery events are listed by priority; an acknowledgement is written to the operator log.

ZONE HEADCOUNTS

How many staff, forklifts, pallets and containers are in each zone is counted live, broken down by asset type.

TAG LIST

Search by tag, person or MAC address; visible, stale and low-battery states appear in a single strip.

BLE Setup screen: drawing zones on the site sketch, site and floor definitions, Locator and tag inventory, and alarm rules.
02 · Setup  Zones are drawn onto the site sketch and floor, zone type and level data are entered. Locator, tag, asset-type and alarm-rule definitions are all managed from the same screen. Screen labels are in Turkish.
ZONE DRAWING

Clicking the sketch adds a corner, and dragging a mid-edge point opens a new one; the area is calculated in m² instantly.

LEVEL AND FLOOR

Entering floor and ceiling levels separates zones vertically in multi-storey sites; zone type is marked by colour.

RULE SET

Alongside the Locator, tag and type inventory, alarm rules are defined in the same place.

The screenshots come from a simulation environment running on demo data; the plan, zone names and figures are illustrative.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 09 · Product screens
09 · Product screens

Muster drill mode and retrospective track replay

Two different tenses of the same location data: in an emergency, who is where now; after an incident, what happened then.

BLE Monitor muster drill mode: live tag positions on the site plan, counters for assembled and still-inside staff, low battery and unauthorized zone entry alarms.
03 · Muster drill mode  When an emergency or drill starts, the number of people who have reached the assembly point and those still inside is tracked with elapsed time. Low battery and unauthorized entry alarms appear on the same screen. Screen labels are in Turkish.
ASSEMBLED

The count of staff who have reached the assembly point rises live.

STILL INSIDE

How many people remain in the building, and in which zone.

ELAPSED

Evacuation time is measured and becomes a post-drill report.

BLE Monitor track replay screen: the movement track of a selected forklift tag drawn on the plan, a transition log listing zone crossings with dwell times, and a playback bar with a time range selector.
04 · Track replay  The selected tag's track over a chosen time range is drawn on the plan and played back and forth on a timeline. Zone crossings are listed with their dwell times, so post-incident review works from the record. Screen labels are in Turkish.
TRACK

The selected tag's path is drawn onto the plan.

TRANSITION LOG

Zone entry times and dwell durations are listed.

PLAYBACK

A time range is selected and the moment is replayed both ways.

The screenshots come from a simulation environment running on demo data; the plan, zone names and figures are illustrative.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart A · 10 · Field validation
10 · Field validation

What the location layer looks like on site

An accuracy claim is measured on a moving asset, not in a laboratory. The images below come from reference installations and validation set-ups.

BLE RTLS validation set-up: an autonomous vehicle prototype moving along a reference track, its live position marked on the digital track plan, and a BLE gateway mounted on an industrial steel roof.
01 · Validation set-up  An autonomous vehicle moving along a reference track is detected by ceiling-mounted BLE devices and its position is marked on the digital plan in real time. Position accuracy and latency are measured on set-ups like this one.
A BLE RTLS position cloud overlaid on a retail store floor plan, with blue position points concentrated around fitting rooms and aisle ends.
02 · Density distribution  A position cloud overlaid on the floor plan shows which zones people spend time in and for how long. The same data supports layout planning, shift planning and the measurement of space utilization.
WHAT VALIDATION MEASURES
  • Position error at reference points
  • Latency from broadcast to screen
  • Track continuity while moving
  • Correct assignment at zone borders
WHY A MOVING ASSET?

The position of a stationary tag is easy to measure. The real difficulty is holding the track of a moving asset without gaps or jumps, which is why acceptance testing is carried out on movement.

Healthcare facility application: BLE position points marked on a patient room floor plan, and the same position markers overlaid on live camera views on an operator screen.
03 · Plan and camera view on one screen  Staff, patient and equipment positions are marked both on the floor plan and on the live camera view.
A bridge to Part C

The operator does not have to switch between screens to verify an alarm: the location and video layers merge in one interface. That merge is also the basis of the CCTV + AI verification described in Part C — the person the camera sees and the card the RTLS sees become comparable on the same zone and the same timeline.

Part A · Plant and precise position
CREATECH · BLE RTLS & AoAPart B · Logistics, delivery and telemetry
Part B · The handover point

When goods leave the door, monitoring does not stop — only the measuring hardware changes

The two ends of the chain run in different environments but share one data model: the BLE location network inside the facility, and telemetry, cameras and the tablet on the vehicle. The handover point between them is the loading dock, where pallets are read by RF-ID or barcode and booked onto the vehicle.

INSIDE THE FACILITY PRODUCTIONWAREHOUSEDISPATCH STAGING AoAAoAAoA Staff, forklifts, pallets and equipment on one network HANDOVER POINT RF-ID BARCODE Checked against the dispatch order ON THE VEHICLE IN-VEHICLE BLE GATEWAY TELEMETRY UNIT IN-VEHICLE TABLET The same staff card is read inside the vehicle; load, position and delivery join one record. SHARED PLATFORM Crealog Position and identity records Load vs. dispatch order match Delivery confirmation, documents Telemetry and video events CreaAI · plain-language query UNBROKEN FLOW OVER 4G / 5G 07:31 07:54 08:03 08:04 CARD SEEN ON THE SHUTTLE ARRIVED AT THE SITE SEEN IN PRODUCTION RELATED ON THE PLATFORM
Diagram · Facility to vehicle, vehicle to platform  The layout, times and zone names are illustrative. The load read at the handover point is compared against the dispatch order, so an error becomes visible before the goods leave the door.
01 · LOAD VERIFICATION

RF-ID and barcode

Pallets, crates and cases are read at the dock and booked onto the vehicle, then compared against the dispatch order — errors are caught before departure.

02 · ONE BLE IDENTITY

The card keeps working at the gate

A BLE gateway on the shuttle reads the same staff card used in the plant. Occupancy, travel time and in-plant flow join under one identity.

03 · UNBROKEN DATA

One data model

The gateway sends data over the vehicle telemetry unit or 4G/5G. In-plant and field data share one schema and are queried together.

Part B · Logistics, delivery and telemetry
CREATECH · BLE RTLS & AoAPart B · 02 · Delivery management
02 · Delivery management

The in-vehicle tablet: the field record and the office document from one source

The driver sees the day's delivery sequence, customer details and load contents on the tablet. Quantity confirmation, partial delivery, returns and refusals are captured on the tablet at the delivery point, with a signature and photo attached to the transaction.

DELIVERY LIST · 04.09.2026 VEHICLE · 34 CT 1907 SEQUENCE · 6 STOPS 01 · Marmara Foods DELIVERED · 09:12 02 · Ege Market Depot PARTIAL DELIVERY · 10:04 03 · Anadolu Logistics OPEN · NEXT STOP 04 · Batı Wholesale WINDOW 11:00 – 13:00 05 · Kuzey Site GEOFENCE DEFINED 03 · QUANTITY CONFIRMATION Product A · pallet12 / 12 Product B · crate40 / 40 Product C · case 18 / 20 2 CASES SHORT · REASON SELECTED CONFIRM PARTIAL RETURN REFUSE SIGNATURE PHOTO
Mock-up · The tablet delivery flow  This screen is drawn in HTML/SVG rather than captured; the customer names, plate and quantities are illustrative.
01 · TASK SEQUENCE

The day's delivery plan

Stops, customers, load contents and the delivery window are on the tablet; changes reach the driver at once.

02 · QUANTITY CONFIRMATION

The quantity actually received

The quantity delivered is confirmed line by line. Anything short, over or damaged is recorded with its reason.

03 · PARTIAL DELIVERY

A delivery left incomplete

When only part of a delivery is accepted, the remainder stays open; balance tracking and rescheduling run from the same record.

04 · RETURNS AND REFUSALS

Goods not accepted

Returns and refusals are captured with a reason code; goods loaded back stay visible in inventory.

05 · PROOF

Signature and photo

The recipient's signature and photo are attached, so disputes are answered from the record.

06 · OFFLINE

It works out of coverage too

Where there is no connection the record is held on the device and uploaded once coverage returns, so the driver never has to wait.

Why on the same platform as the plant?

The RF-ID/barcode read at loading and the quantity confirmed on the tablet belong to one dispatch order, so “loaded” versus “delivered” is visible in a single query.

Part B · Logistics, delivery and telemetry
CREATECH · BLE RTLS & AoAPart B · 03 · Document flow
03 · Document flow

The delivery note and the invoice are produced from the field record itself

The load list verified at loading becomes the source for the delivery note, and the quantity confirmed at delivery becomes the source for the invoice. Documents are created on the platform and pushed to the existing ERP or e-document infrastructure: the field record and the accounting document come from the same data.

01 · DISPATCH ORDER Planned load anddelivery points PLATFORM / ERP 02 · LOAD VERIFICATION The actual load readby RF-ID and barcode LOADING DOCK 03 · DELIVERY NOTE Produced from theverified load list e-DESPATCH READY 04 · DELIVERY CONFIRMATION Quantity confirmed onthe tablet, plus proof IN-VEHICLE TABLET 05 · INVOICE The confirmed quantityis the invoice source e-INVOICE READY 06 · ERP AND e-DOCUMENT Existing ERP integration Push to e-document platform Accounting and reconciliation API · ONE-WAY OR TWO-WAY Documents are created on the platform and flow to your system. VARIANCE ANALYSIS · LOADED ↔ DELIVERED Shortages, overages, returns and refusals in one query. ONE DISPATCH ORDER NUMBER TIES THE WHOLE CHAIN TOGETHER
Diagram · The document chain  Every step draws on the record before it, so no manual data entry is left between the field and the document.
ONE SOURCE

No manual entry

Beyond the barcode read at loading and the quantity confirmed on the tablet, no separate data entry is needed, so transcription errors disappear.

TRACEABILITY

What is each line tied to?

A document line carries which pallet, which vehicle and which delivery confirmation it came from. In a dispute, the evidence is inside the record.

SPEED

Less billing delay

As soon as the delivery confirmation lands on the platform, an invoiceable record is ready; there is no wait for end-of-day paperwork.

COMPATIBILITY

It works with what you have

Your ERP and e-document setup is left untouched. The platform produces the document and pushes it to the existing system over an API.

Part B · Logistics, delivery and telemetry
CREATECH · BLE RTLS & AoAPart B · 04 · Telemetry
04 · Telemetry

The on-vehicle hardware layer: far more than position

Position, speed, fuel, door, drum and sensor data are collected by the on-board unit and sent to the control center. The driver sees the task sequence and any alerts on the in-vehicle tablet, and when a deviation or anomaly is detected the system steps in immediately.

1 2 3 4 5 6 7 8 4G / 5G · CREATECH CLOUD Live stream, archive, alarms CREALOG PLATFORM
1  GNSS antenna · position, route, speed 2  On-board telemetry unit 3  In-vehicle tablet · tasks, alerts 4  Speed, odometer, vehicle bus (CAN) 5  Fuel level and consumption 6  Door and lock sensor 7  Temperature and humidity · cold chain 8  Sector-specific sensor input
The diagram is drawn on a box-body vehicle; in tanker, mixer and bus configurations the sensor set changes with the vehicle.
01 · LIVE TELEMETRY

A continuous stream

Vehicle data flows continuously to the center over sensors and the vehicle bus; map, list and chart views feed from one stream.

02 · TABLET INTEGRATION

The driver's side

Drivers follow task and delivery information live on the in-vehicle tablet and talk to the center both ways.

03 · REAL-TIME ALERTS

Deviation and anomaly

A route deviation, movement outside a zone, a door opening or a threshold breach notifies the center.

EVENT TYPES PRODUCED FROM TELEMETRY
Route deviationGeofence breach SpeedingExcessive idling Harsh brakingDoor opening Fuel dropTemperature breach Drum rotationUnplanned stop Service threshold
SECTOR EXAMPLE · CONCRETE

The mixer drum's direction and speed are read continuously; discharge is detected automatically and the mixing data is logged with a timestamp.

SECTOR EXAMPLE · COLD CHAIN

Compartment temperature monitoring continues through the in-vehicle sensors once the goods are loaded; a threshold breach raises an alarm.

Part B · Logistics, delivery and telemetry
CREATECH · BLE RTLS & AoAPart B · 05 · Route optimization
05 · Route and dispatch optimization

The same delivery list over a shorter route and to a predictable schedule

Vehicle positions, live traffic data and delivery priorities are analysed at the same time to determine the most efficient route. The three things optimization manages are linked: cost, time and equipment.

UNPLANNED SEQUENCE · BY DRIVER EXPERIENCE DEPOT DUPLICATE DISTANCE 214 KM · 9 H 40 MIN · 3 STOPS OUTSIDE WINDOW OPTIMIZED SEQUENCE · A SINGLE LOOP 123 456 78 DEPOT 176 KM · 7 H 35 MIN · NONE OUTSIDE WINDOW
Diagram · Unplanned versus optimized sequence  The same depot and eight delivery points in both panels; only the visit order changes. The distance, duration and window figures are illustrative examples, not measured results.
01 · COST

Distance and fuel

  • Total trip distance and fuel consumption fall
  • Empty returns and duplicate legs never enter the plan
  • Trip cost is reported per vehicle and per driver
02 · TIME

Trip duration and window

  • Arrival time is calculated before departure
  • Stops outside the window raise a warning at planning
  • Cancellations or new orders resequence the day
03 · EQUIPMENT

Vehicle and compartment capacity

  • Load factor is measured for every trip
  • Fewer trips leave half loaded
  • Fleet size is planned to real demand
CONSTRAINTS CONSIDERED
Time windowCompartment capacity Product typeGeofence Traffic and roadsDriver hours BreaksPriority deliveries
Part B · Logistics, delivery and telemetry
CREATECH · BLE RTLS & AoAPart C · Safety and artificial intelligence
Part C · A second sensing layer

The layer that reveals a card not being carried: CCTV + AI

Thanks to the CCTV integration and AI models developed by our R&D team, if a person detected in camera footage is in a zone with no matching BLE staff card signal, the system can treat that as a “card-less person” event.

01 · CCTV + AI · CAMERA VIEW ● LIVE CAM-07 · PRODUCTION PERSON 01 PERSON 02 Model output: how many people, which camera, which zone. 02 · BLE RTLS · ZONE RECORD ZONE · PRODUCTION HALL · GROUND FLOOR PR-13 · CARD OK NO CARD SIGNAL Identity and position of the cards in the zone: 1 card · 2 human detections 03 · CREATECH RULE ENGINE The camera zone is matched to the RTLS zone Counts are compared over the same time window An unmatched detection raises an event EVENT · CARD-LESS PERSON Production Hall · CAM-07 · 14:26 2 people detected · 1 matching card SENT TO THOSE CONCERNED · LOGGED
Diagram · Two data sources, one decision  Camera and RTLS are compared over the same zone and the same time window. Zone names, camera code and time are illustrative.
CCTV + AI

Detects human presence

The AI model detects human presence in the image together with the relevant camera and zone. Its output is presence, not identity.

BLE RTLS

Supplies identity and position

It provides the identity and position of the staff cards present in the zone. Where AoA is installed, that position is at precise X-Y level.

RULE ENGINE

Compares by time and zone

It compares AI human detection against BLE card presence by time and by zone, and raises the mismatch as an event.

WHY IT MATTERS

This capability is not an alternative to the BLE system; it is a second sensing layer that complements the RTLS infrastructure by confirming human presence with a camera. The reliability of the project no longer rests on card-wearing discipline alone.

Part C · Safety and artificial intelligence
CREATECH · BLE RTLS & AoAPart C · 02 · Vision analysis
02 · AI-powered vision analysis

In-cab and surround footage is analysed on the vehicle

The system monitors in-cab driver behaviour in real time using AI-powered cameras. It detects safety violations automatically and warns both the driver and the control center; each driver's violation history and safety score is tracked on the central dashboard.

● IN-CAB CAMERA 34 CT 1907 · 14:26 FACE · GAZE TRACKING PHONE SEAT BELT NOT WORN DRIVER SAFETY SCORE · CENTRAL DASHBOARD DR-104 2 VIOLATIONS · 30 DAYS DR-211 11 VIOLATIONS · 30 DAYS
Mock-up · In-cab analysis and scoring  The view, detection boxes and score values are SVG mock-ups; the plate, driver codes and numbers are illustrative.
01 · PHONE USE

Detected while driving

If the driver picks up a phone while driving, the system detects it at once, warns in the cab and reports the event to the center.

02 · SMOKING

Where fire is a risk

The in-cab camera detects smoking; the driver is warned at once, keeping fire and explosion risk to a minimum.

03 · SEAT BELT

Checked while moving

Whether the seat belt is fastened is checked and logged while the vehicle is moving; if not, an urgent warning is triggered.

04 · FATIGUE

Eye and gaze analysis

Signs of fatigue and distraction such as closing eyes, a dropping head or prolonged gaze deviation are analysed in real time.

05 · SCORING

Per-driver reporting

Each driver's violation history and safety score is tracked on the central dashboard, with detailed reports on demand.

06 · ON-VEHICLE PROCESSING

Analysed on board

Analysis runs on the vehicle, so the cab warning needs no connection; only events and their footage reach the center.

The purpose · protecting human life

The purpose is not to penalise but to prevent workplace accidents and keep safety standards high in dangerous goods transport.

Part C · Safety and artificial intelligence
CREATECH · BLE RTLS & AoAPart C · 03 · Camera, radar and event recording
03 · Camera, radar and event recording

Surround sensing and event-based management of footage

The video layer does three jobs at once: access from anywhere (cloud camera), detecting the unseen (blind spot radar) and keeping the right moment (event-based recording). All three write to the same event stream.

BLIND SPOT RADAR · PLAN VIEW CAB BODY PEDESTRIAN REAR-RIGHT BLIND SPOT TWO-WHEELER LEFT LANE IN-CAB WARNING Audible alarm + visual alert BEFORE THE MANOEUVRE WIDE-ANGLE SENSORS COVERING FRONT, SIDES AND REAR
The coverage angles and distances shown were chosen to illustrate the principle; real coverage depends on the vehicle type and the sensor configuration.
01 · INSTANT WARNING

Audible and visual

An object in a blind spot triggers an alarm in the cab, so the driver knows before manoeuvring.

02 · WIDE ANGLE

Side and rear coverage

Sensors covering both sides and the rear cover lane changes and reversing.

03 · LOGGING

Input to risk analysis

Every event is logged with a timestamp; driver-level risk analysis follows.

CLOUD CAMERA · 01

Remote access

The cameras on every vehicle in the fleet can be reached live over the internet, at any time and from anywhere; recorded footage opens in the same interface.

CLOUD CAMERA · 02

Automatic backup

Critical footage is backed up to the cloud automatically, preventing data loss and preserving continuity of record in dangerous goods transport.

CLOUD CAMERA · 03

Real-time event alerts

When a safety or operational risk is detected, managers receive an immediate alert backed by footage.

CLOUD CAMERA · 04

Archive and reporting

Events are easy to filter and detailed safety reports are produced quickly; the footage archive can be searched by event type.

EVENT-BASED RECORDING · BEFORE AND AFTER IN ONE FILE PRE-EVENT BUFFER POST-EVENT RECORD EVENT · TRIGGER ROLLING BUFFER NORMAL STREAM MERGED INTO ONE FILE · ARCHIVED
When a defined event occurs, recording is triggered at once; the footage from before and after the event is merged automatically into a single file, archived and sent to the people concerned. Remote analysis and fast decisions work from that file.
Part C · Safety and artificial intelligence
CREATECH · BLE RTLS & AoAPart C · 04 · Geofence and compliance
04 · Geofence and compliance

Automatic camera shutdown in restricted areas: compliance becomes systematic

At some sites, camera recording is prohibited by law for operational reasons. With geofence-based camera management, these sites are marked on the digital map once; the camera system switches off the moment the vehicle crosses the boundary and comes back on when it leaves.

DEFINED RESTRICTED SITE MARKED ON THE MAP ONCE RECORDING PROHIBITED BY LAW 01 · CAMERA ON OUTSIDE · NORMAL RECORDING 02 · CAMERA OFF AUTOMATIC ON ENTRY 03 · ON AGAIN AUTOMATIC ON EXIT AUDIT LOG 10:14:22Boundary entered 10:14:22Camera switched off 10:14:23Center notified 10:52:07Boundary exited 10:52:07Camera switched on When and where the camera went off and on is logged; the compliance record is built from that log.
Diagram · Geofence-based camera management  The boundary geometry, times and route are illustrative. The same geofence infrastructure also serves route-deviation, out-of-zone discharge and unplanned-stop scenarios.
01 · ZONE DEFINITION

Marked once

Restricted sites are marked on the map once; the system remembers those boundaries permanently and applies them to every vehicle.

02 · AUTOMATIC ACTIVATION

No driver action

Cameras switch off when the vehicle enters the boundary and on when it leaves. Because no manual step is needed, human error is eliminated.

03 · FULL AUDIT LOG

A compliance record

When and where the camera went off and on is logged, producing a compliance record that can be presented in an audit.

04 · CENTRAL MANAGEMENT

Updated from one place

Zone rules for the whole fleet are updated and monitored from one platform; adding a new site is a single operation on the map.

Part C · Safety and artificial intelligence
CREATECH · BLE RTLS & AoAClosing · Shared platform and CreaAI
Closing · Shared platform

The whole chain comes together in one data model

Location and temperature data from inside the facility, production records from line automation, the barcode and RF-ID reads captured at loading, the delivery confirmations taken on the tablet, and the telemetry, camera, radar and vision analysis output from the vehicle all come together in one data model on the Crealog platform.

LINK 01 · INSIDE THE FACILITY BLE RTLS · AoA precise position Cold storage monitoring Line automation · PLC / SCADA LINK 02 · LOADING AND DOCUMENTS RF-ID and barcode verification Delivery on the tablet Delivery note and invoice flow LINK 03 · ON THE VEHICLE Telemetry · on-board unit Cloud camera · blind spot radar Route and dispatch optimization LINK 04 · SAFETY AND AI CCTV + AI · card-less person Driver behaviour analysis Geofence · event recording Crealog · one shared data model Position, identity, load, documents, telemetry and events in one schema, read together in a single query. ONE IDENTITY ONE CLOCK ONE ZONE ONE API SHARED KEYS LET THE LAYERS BE QUERIED TOGETHER CREAAI · PLAIN-LANGUAGE QUERY AND AUTOMATIC REPORTING “How many dangerous proximity events happened last week, and where?” An answer in plain language FROM THE PLATFORM'S OWN DATA Excel / CSV / PDF report THE SAME RESULT AS A FILE
Diagram · Four links, one data model  The layers can be commissioned in sequence; whichever order they are installed in, they join over the same keys. The example question and output formats are illustrative.
DATA STAYS IN-HOUSE

The platform works from its own data

Queries run against the organization's own platform records, so the answer interprets what is in the system rather than information gathered from outside.

PERMISSION-AWARE ANSWERS

Who can ask what?

Answers stay within the user's own permissions; a user without the necessary rights cannot reach the underlying records indirectly either.

TRACEABLE RESULTS

The records behind the answer

Answers and reports show the records they derive from, so a questioned figure can be traced to its source.

Closing · Shared platform and CreaAI
CREATECH · BLE RTLS & AoAClosing · Roll-out roadmap
Closing · Roll-out roadmap

An installation that starts with a pilot and is measured against acceptance criteria

The project runs in seven phases. Precision and performance targets become numerical acceptance criteria after the pilot, not before installation, and the roll-out is built on the validated design.

01 SURVEY Site survey RF analysis REQUIREMENTS MAP 02 DESIGN Zone and accuracy class decisions HYBRID ARCHITECTURE 03 DEVELOPMENT Rule sets and integrations ERP · API 04 PILOT AND TEST Real measurement in a limited area CALIBRATION 05 INSTALLATION Roll-out and commissioning SITE MOUNTING 06 ACCEPTANCE Acceptance test at measurement points CRITERIA VERIFIED 07 MONITORING Service, maintenance and development CONTINUITY THE COMMITMENT BECOMES NUMERICAL BETWEEN THESE TWO PHASES
WHAT THE ACCEPTANCE TEST MEASURES
  • Position accuracy: error at reference points, by zone class
  • Zone detection: correct-assignment rate and border behaviour
  • Latency: time from broadcast to screen and to alarm
  • Coverage: dead-spot sweep and Locator lines of sight
  • Alarm accuracy: false alarms and misses counted per scenario
  • Battery life: expected service life at the chosen broadcast interval
Why is a pilot essential?

The same hardware gives different results in different plants: metal density, racking layout, ceiling height and machine bodies all shape the RF environment. A pilot shows whether the commitment holds on site.

TARGET
100%MACHINE VISIBILITY Every robot and machine monitored from one platform.
TARGET
60%FAULT DETECTION TIME ↓ Central data flow shortens response time.
TARGET
40%DOWNTIME ↓ Predictive maintenance data reduces unplanned stops.
TARGET
95%DATA AVAILABILITY Different brands and protocols in one structure.
About these figures

The percentages above are target values, not measured results from an installation. Project-specific targets are set by measuring the current baseline and reviewing the pilot results.

Closing · Roll-out roadmap
CREATECH · BLE RTLS & AoAClosing · Contact and next step
Next step

Not a tracking system,
but a digital infrastructure

Infrastructure that starts with staff tracking can grow into forklift safety, pallet and equipment tracking, stock counting, shuttle vehicles, delivery management, telemetry and CCTV/AI verification. The investment is never tied to a single problem.

Solving today's need while running tomorrow's scenarios on the same infrastructure.

01

Site survey

The site's RF environment, zone requirements and accuracy classes are determined together.

02

Pilot area

Real measurement in a limited area; the commitment becomes numerical from that measurement.

03

Demo

A live walkthrough of the BLE Monitor, setup and reporting screens.

CONTACT
PHONE +90 850 441 27 32
E-MAIL info@createch.com.tr
WEB AND DOCUMENTATION www.createch.com.tr/en  ·  wiki.createch.com.tr
ADDRESS Ulamış Mah. 75. Yıl Cumhuriyet Cad. No:19/3
Seferihisar / İzmir · Türkiye
OUR OTHER SOLUTION DOCUMENTS
Energy · fuel distribution Food · cold chain Concrete / cement · mixer Public transport · fleet Environmental monitoring Industrial automation CreaAI · artificial intelligence
CREATECH Createch Yazılım Danışmanlık ve Bilgi Teknolojileri San. Tic. Ltd. Şti.
Createch R&D · Industrial Positioning and AI Integration